top of page
Screen Shot 2019-04-01 at 8.49.31 PM.png
Screen Shot 2019-04-01 at 8.45.51 PM.png
Final Report Summary
The documents above serve as the Final Senior Thesis Report. The three analyses included in the final report are: an acoustical analysis of the group fitness room, an analysis for the addition of a PV system on the roof, and an analysis for the use of modular bathrooms. Each analysis includes a cost and schedule analysis to understand their advantages and disadvantages. Additionally, there will be a section that discusses the results of a survey conducted on Lean Construction Methods.

Note: While great efforts have been taken to provide accurate and complete information on the pages of CPEP, please be aware that the information contained herewith is considered a work‐in progress for this thesis project. Modifications and changes related to the original building designs and construction methodologies for this senior thesis project are solely the interpretation of Sean Parahus. Changes and discrepancies in no way imply that the original design contained errors or was flawed. Differing assumptions, code references, requirements, and methodologies have been incorporated into this thesis project; therefore, investigation results may vary from the original design.

bottom of page