top of page
Screen Shot 2019-04-01 at 8.49.31 PM.png
Screen Shot 2019-04-01 at 8.45.51 PM.png
Final Report Summary
The documents above serve as the Final Senior Thesis Report. The three analyses included in the final report are: an acoustical analysis of the group fitness room, an analysis for the addition of a PV system on the roof, and an analysis for the use of modular bathrooms. Each analysis includes a cost and schedule analysis to understand their advantages and disadvantages. Additionally, there will be a section that discusses the results of a survey conducted on Lean Construction Methods.
bottom of page